Old Handle Holes Are Filled Before Cabinet Painting Begins
New pulls rarely match the spacing of old ones. If the old holes are left open, they show through the fresh paint. We fill each old hole, let it cure, sand it flat and prime it before the finish coats.
New holes are drilled with a template so every pull sits at the same height and distance from the edge. This work happens before the final coats, so the new holes are clean and sealed.
Soft-Close Hinges Are Easiest To Add During Cabinet Painting
Soft-close hinges stop doors from slamming. Older Erin Mills kitchens often have face-frame hinges that can be swapped for soft-close versions of the same style. Some doors need new hinge cups drilled.
With fronts off for cabinet painting anyway, a soft-close upgrade costs less now than on a later visit. We also adjust every hinge when the doors go back up so the gaps are even.
Choose Hardware Before The Cabinet Painting Starts
The hardware finish should work with the new cabinet colour. Brass pulls look warm on sage, navy and cream. Black bar pulls look sharp on white and greige. Brushed nickel and chrome suit grey and blue.
We ask you to choose hardware before the work starts so the holes can be drilled at the right spacing. You can buy the hardware yourself, or we can include it in the quote.
Hardware Goes On After The Cabinet Painting Finish Hardens
Fresh enamel is soft for the first few days. Screwing pulls on too early can crack or dent the finish around the screw. Pulls go on last, after rehanging and once the coating has firmed.
We tighten each pull carefully and check that every door and drawer opens and closes smoothly before we leave.
Hardware Spacing Is Planned Before Cabinet Painting
Pulls come in set sizes, measured from the centre of one screw hole to the centre of the other. Common sizes are 3 inches, 96 mm, 128 mm and 160 mm, and long bar pulls can be much longer. Knobs need only one hole.
Your new pull size gets confirmed ahead of cabinet painting. If the new pull uses one of the existing holes, we fill only the other. If it uses neither, both old holes are filled. That planning keeps the finished doors clean with no marks.
Drawer fronts often need a pull centred on the front, while doors need a pull near the opening edge. We mark each one with the template so the whole kitchen lines up.